SERVICES / INSTALLATION AUDITS

Audits and diagnostics of your installations

The operating conditions of an installation can change over the course of its service life. Component wear, a change of product, changes in flow rates, process developments or equipment ageing can progressively affect its operation.

An installation audit provides an assessment of actual operating conditions, identifies areas requiring attention and determines the actions to be considered to maintain or improve equipment operation.

Sodimate’s technical teams draw on their knowledge of powder storage, discharge, dosing, transfer and preparation installations, as well as sludge handling systems, to support operators throughout this process.

Sodimate installation audit

Why carry out an installation audit?

An installation may continue to operate while showing signs of wear, declining performance or operating conditions that differ from those anticipated at the design stage.

An audit provides an assessment of the installation, identifies the causes of potential malfunctions and determines which equipment or components require monitoring, intervention or adaptation.

It also helps anticipate certain maintenance operations and component replacements before further deterioration affects the operation of the installation.

When should an audit be carried out?

Sécurité et conformitéPicto technique fin représentant un bouclier et une flamme de conformité, sans fond.

Malfunctions or irregular performance

Powder flow difficulties, dosing irregularities, transfer problems, blockages or other disturbances may require an analysis of the installation to identify their cause.

Accompagnement globalPicto technique fin représentant un globe, un réseau et un accompagnement global, sans fond.

Installation in operation for several years

An audit provides an opportunity to examine the general condition of the equipment and the main components subject to wear in order to identify the work that needs to be planned.

TransfertIcône technique Sodimate - Transfert

Changes to the product or process

A change in product, physical characteristics, flow rate or operating conditions can affect the behaviour of an installation.

The analysis can then determine whether the current operating conditions remain compatible with the equipment configuration.

Ingénierie sur mesurePicto technique fin composé de modules et repères, sans fond.

Modification or modernisation project

Before modifying an installation, an assessment of the existing system can identify which equipment can be retained, the layout constraints and the modifications to be considered.

Main inspection points

The scope of the audit is adapted to the installation, its history, the products handled and the issues encountered.

DosageIcône technique Sodimate - Dosage

Condition of equipment and wear components

The general condition of the equipment is examined to identify signs of wear, deterioration or abnormal operation.

Particular attention may be paid to components directly subjected to mechanical operation or contact with the product handled: bin activator turbine blades, dosing or transfer spirals, wear liners on sludge conveyors or other exposed mechanical parts.

Performance et fiabilitéPicto technique fin représentant un cadran de performance, sans fond.

Actual operating conditions

The analysis takes into account the product handled, flow rates, operating times, settings and any changes made since the installation was designed.

This approach makes it possible to relate the condition of the equipment to its actual operating conditions.

AutomatisationIcône technique Sodimate - Automatisation

Operation of the different process stages

Storage, discharge, dosing, transfer and preparation functions are analysed with their interactions taken into account.

A dosing irregularity, for example, may be linked to upstream product flow conditions. The objective is therefore to identify the root cause of the problem rather than simply addressing its consequences.

Sécurité et conformitéPicto technique fin représentant un bouclier et une flamme de conformité, sans fond.

Filtration and safety devices

Where the installation includes a silo, the condition and operation of the filtration systems and safety devices may also be examined.

Insufficient filter maintenance can, in particular, restrict air discharge during filling and lead to pressure build-up in the silo.

Sécurité et conformitéPicto technique fin représentant un bouclier et une flamme de conformité, sans fond.

ATEX compliance

Where the installation includes areas with a dust explosion risk, the audit may also be used to check that the equipment is consistent with the ATEX zoning defined for the installation.

From audit to action plan

01

Installation analysis

Review of the configuration, equipment condition, operating conditions and issues encountered.

02

Identification of areas requiring attention

Identification of equipment, components or operating conditions requiring particular attention.

03

Diagnosis and recommendations

Definition of the actions to be considered based on the findings: additional inspection, adjustment, maintenance, component replacement or assessment of a modification.

04

Prioritisation of interventions

Organisation of the actions to prioritise the interventions according to their importance and the needs of the installation.

The objective is to identify the interventions that are actually required based on the condition of the installation and its operating conditions.

Installation audits, maintenance or modernisation

The conclusions of the audit help determine the actions to be taken.

Where the equipment remains suitable for the required duty, maintenance, adjustment or replacement of wear components may be sufficient.

Where operating conditions or process requirements have changed, an adaptation or a study to modernise the installation may be required.

Performance et fiabilitéPicto technique fin représentant un cadran de performance, sans fond.

Maintenance

Plan the inspections and interventions required to keep the installation in operational condition.

DosageIcône technique Sodimate - Dosage

Spare parts

Identify the components required to maintain the installation.

Ingénierie sur mesurePicto technique fin composé de modules et repères, sans fond.

System and engineering

Assess a modification or development of the installation when process requirements have changed.

FAQ – Installation audits

When should an installation audit be carried out?

An audit may be considered when an installation experiences malfunctions or irregular performance, after several years of operation, or when a change to the product, process or operating conditions is being considered.

Can an installation that is still operating be audited?

Yes. An audit can identify signs of wear and areas requiring attention before they lead to a deterioration in operation or an installation shutdown.

Can a change of powder affect the operation of an installation?

Yes. The particle size distribution, bulk density, moisture content, abrasiveness or flow behaviour of a powder can influence its storage, discharge, dosing and transfer.

What happens after the audit?

The findings are used to define the actions to be considered: maintenance, component replacement, adjustments or assessment of an installation modification, depending on the needs identified.

How long does an installation audit typically take?

The duration depends on the scope of the installation and the number of items of equipment to be examined. It is defined with the operator when preparing the intervention.

LET’S DISCUSS YOUR REQUIREMENTS

Would you like an assessment of your installation?

Sodimate’s technical teams support you in analysing its operation, identifying areas requiring attention and defining the actions to be considered.

Contact our technical team

Accompagnement globalPicto technique fin représentant un globe, un réseau et un accompagnement global, sans fond.
Accompagnement globalPicto technique fin représentant un globe, un réseau et un accompagnement global, sans fond.

Opening hours
Monday to Thursday, 8:30 am to 12:45 pm and 2:00 pm to 6:00 pm; Friday, 8:30 am to 12:30 pm.

This site uses cookies to measure audience and improve your experience. Cookies