SERVICES / COMMISSIONING
Commissioning of your Sodimate installations
Commissioning is the transition stage between equipment installation and operation under actual process conditions.
It provides an opportunity to check the operation of the different items of equipment, their sequence of operation within the installation and to make the necessary adjustments before the installation enters operation.
Sodimate technicians support the start-up of installations designed and manufactured by Sodimate. This service forms part of the continuous support provided from engineering and design through to installation and start-up.
Preparing for installation start-up
Commissioning requires the installation to be ready for operation and the interfaces required for start-up to be available.
Before testing, depending on the scope of the project, technicians may check that the equipment is correctly positioned and assembled, as well as the systems required for their operation.
This stage helps identify any discrepancies before start-up and ensures that the conditions required for testing are in place.
Main stages of commissioning
01
Installation check
Inspection of the equipment and its configuration before start-up within the scope of Sodimate’s supply.
02
Functional testing
Operation of the different items of equipment to check their sequences and interactions within the installation.
03
Adjustments
Adjustment of the parameters required for the operation of the installation according to the product handled and process requirements.
04
Operator support
Presentation of how the installation operates and the main points operators need to know for its operation and monitoring.
Checking and adjusting the installation under actual operating conditions
Commissioning involves more than simply starting up each item of equipment individually. It also verifies their operation in the sequence defined during the engineering phase and under the conditions encountered on site.
In a powder handling installation, the different functions are directly interconnected. Product discharge conditions can affect dosing; the dosed flow rate must be compatible with the transfer system; and, where preparation is required, the powder feed must be consistent with the other process parameters.
Product characteristics also affect the operation of the installation. Bulk density, particle size distribution, moisture content and flow behaviour can, in particular, affect discharge, dosing and transfer.
The tests carried out during start-up therefore make it possible to compare the parameters defined during the engineering phase with actual site conditions and, where necessary, adjust the settings of Sodimate equipment.
For gravimetric dosing systems, for example, the actual measured flow rate is compared with the setpoint so that feeder operation can be adjusted. Calibration is also carried out during start-up to allow the system to operate during certain phases of its cycle.
The objective is to check the overall consistency of the installation and achieve operation in accordance with the defined requirements before routine operation begins.
Supporting operating teams during handover
Commissioning also provides the operating teams with the information required to understand and use the installation.
Depending on the scope defined for the project, this support may cover the operating principle, use of the equipment, main settings and monitoring points required during operation.
This transfer of knowledge facilitates the operating teams’ familiarisation with the installation and helps operators better understand the interactions between its different functions.
Depending on the project, start-up may also include personnel training. Sodimate has several references involving operator support during start-up.
From commissioning to installation operation
Commissioning marks the transition from project delivery to operation. The installation can then continue to be supported throughout its lifecycle, depending on its condition and the operator’s requirements.
Maintenance
Plan the inspections and interventions required to keep the installation in operational condition.
Spare parts
Identify the components required for maintenance and the replacement of parts subject to wear.
Installation audits
Analyse an existing installation when its operation changes or areas requiring attention arise.
FAQ – Commissioning
When does commissioning take place?
Commissioning takes place once the equipment has been installed and the conditions required for start-up and testing are in place.
Why involve a Sodimate technician during commissioning?
The technician is familiar with the operating principles of the equipment and the installation designed by Sodimate. Their involvement provides support with the checks, tests and adjustments within Sodimate’s scope during start-up.
Can settings be adjusted during commissioning?
Yes. Certain parameters can be adjusted according to the product actually handled and the operating conditions encountered on site, within the limits defined for the installation.
Does commissioning include operator support?
Depending on the scope defined for the project, start-up may include support or training for the teams operating the installation.
LET’S DISCUSS YOUR REQUIREMENTS
Are you preparing to commission a Sodimate installation?
Sodimate technicians support you during the start-up of your installation, from checking its operation through to handover to the operating teams.
Contact our technical team
Phone
Opening hours
Monday to Thursday, 8:30 am to 12:45 pm and 2:00 pm to 6:00 pm; Friday, 8:30 am to 12:30 pm.