SERVICES / MAINTENANCE
Maintenance of your Sodimate installations
A powder storage, dosing, transfer or preparation installation is subject to mechanical stresses that vary according to the product handled, operating conditions and operating frequency.
Equipment maintenance makes it possible to identify and replace components subject to wear, inspect the main components of the installation and limit deterioration that could affect the operation of the installation.
Sodimate’s technical teams support operators with the maintenance of their installations and can provide on-site assistance according to the identified requirements. Sodimate recommends regular maintenance of its equipment to preserve its performance and availability.
Maintaining installation performance over time
Installation maintenance must be adapted to the equipment, operating time, product handled and actual operating conditions.
The characteristics of powder products influence the wear of components in contact with the product. Particle size distribution, abrasiveness, moisture content and flow behaviour are among the parameters that can affect the equipment.
Regular maintenance makes it possible to inspect their condition and intervene before excessive wear disrupts the operation of the installation.
RECOMMENDED INTERVAL
Basic maintenance every two years
Sodimate recommends regular maintenance of its installations, with basic maintenance recommended every two years. The frequency must nevertheless be adapted to the equipment and its operating conditions.
In the event of a breakdown resulting in an operational shutdown outside a planned maintenance intervention, Sodimate’s technical teams can be contacted to advise the operator on the appropriate course of action and, if necessary, arrange a priority intervention.
Sodimate’s technical teams operate in France and internationally, either directly or with the support of local partners depending on the location of the installation.
Main maintenance points
The scope of a maintenance intervention depends on the type of installation, the equipment installed, its use and its condition.
Discharge and dosing
Discharge and dosing equipment includes mechanical components that are in direct contact with powder products.
Inspecting their condition makes it possible, in particular, to monitor wear on the components involved in product discharge, flow and dosing.
On the Sodimate mechanical bin activator with metering conveyor, an isolation gate makes it possible to isolate the silo during maintenance operations.
Conveying and transfer
Components used to convey or transfer the product must be inspected according to the stresses to which they are subjected and the characteristics of the product being conveyed.
The condition of spirals, drive components and components exposed to product flow may, in particular, require monitoring throughout the service life of the installation.
Preparation and handling
Reagent preparation and sludge handling equipment have their own components subject to wear.
The design of certain Sodimate equipment facilitates maintenance operations. The MBV sludge mixer, for example, has removable covers providing access to internal components.
Silo filtration and safety devices
Maintenance of the filtration system contributes to the correct operation of the silo during filling.
An inadequately maintained filter can restrict air discharge and lead to pressure build-up. The safety valve is therefore an essential component for protecting the silo against overpressure and underpressure. Sodimate emphasises the importance of maintaining both components.
ATEX compliance
For installations that include areas with a dust explosion risk, equipment maintenance also contributes to maintaining compliance with the applicable ATEX requirements.
Anticipating wear and preparing interventions
The service life of a component depends on its operating conditions, the number of operating hours and the characteristics of the product with which it comes into contact.
Monitoring its condition makes it possible to anticipate replacement and prepare the intervention before excessive wear leads to a failure or results in part of the installation becoming unavailable.
This anticipation makes it possible to prepare the necessary parts and organise the intervention according to the site’s operating constraints.
A multi-year maintenance contract for long-term peace of mind
In addition to individual interventions, Sodimate offers multi-year maintenance contracts lasting from 2 to 10 years, adapted to the service life of the installation and the operator’s requirements.
This type of commitment moves maintenance away from a reactive, case-by-case approach towards a planned and proactive strategy jointly managed by Sodimate’s teams and the customer’s teams.
Equipment availability
Planned and regular maintenance limits excessive wear and unplanned shutdowns, helping to maintain installation availability throughout the duration of the contract.
Peace of mind
Sodimate manages the planning of maintenance interventions. The operator has a single point of contact and no longer needs to keep track of the maintenance schedules for each item of equipment.
Compliance with the maintenance plan
The contract ensures that the recommended maintenance intervals for each item of equipment are followed, avoiding the postponement or omission of operations that could affect the long-term operation of the installation.
Contract flexibility
The duration and scope of the contract are tailored to the installation and can be adjusted as its requirements evolve: addition of equipment, adjustment of maintenance frequency or changes to the operations covered.
From routine maintenance to on-site intervention
Not all maintenance requirements call for the same level of intervention.
Certain operations can be carried out by the operating teams as part of the maintenance procedures defined in the equipment manuals. Others may require intervention or on-site supervision by Sodimate’s technical teams.
The installation and maintenance manuals supplied with the equipment provide a reference for identifying the operations required for each item of equipment.
01
Routine maintenance
Carry out the operations defined in the equipment manuals.
02
Component inspection
Inspect components and identify signs of wear or deterioration.
03
Replacement of wear parts
Prepare and replace the parts required to maintain equipment operation.
04
Technical intervention
Arrange on-site intervention or supervision by Sodimate when required.
Maintenance, audits or spare parts?
The nature of the requirement determines which service is appropriate.
Installation audits
When the cause of a malfunction has not been identified or the overall condition of the installation needs to be assessed, an audit can identify areas requiring attention and the actions to be considered.
Spare parts
When a component needs to be replaced, Sodimate teams can identify and supply the parts suitable for the equipment concerned.
System and engineering
When the installation or its operating conditions have changed to the extent that a modification is required, an engineering study can be carried out to adapt its configuration.
FAQ – Maintenance
How often should a Sodimate installation be maintained?
The maintenance frequency depends on the equipment, the number of operating hours, the product handled and the operating conditions. Sodimate recommends basic maintenance every two years, with the operations and frequencies applicable to each item of equipment determined according to its use and the recommendations in its documentation.
Which components should be monitored?
The components to be inspected depend on the equipment installed. Mechanical components directly exposed to the product, wear parts, filtration systems and safety devices are among the items that may require regular monitoring.
Can Sodimate provide on-site maintenance?
Yes. Sodimate’s technical teams can provide on-site intervention or supervision depending on the requirements.
How do I know whether maintenance is sufficient or an audit is required?
When the work to be carried out is known and involves maintenance or component replacement, a maintenance intervention may be appropriate. When the cause of a problem has not been identified or several functions of the installation appear to be affected, an audit provides a broader assessment of its operation.
What should I do in the event of a breakdown preventing operation outside a planned intervention?
The operator can contact Sodimate’s technical teams, who will advise on the appropriate course of action and, if necessary, arrange a priority intervention.
LET’S DISCUSS YOUR REQUIREMENTS
Would you like to schedule maintenance for your installation?
Sodimate’s technical teams support you with equipment maintenance and the preparation of the interventions required to keep your installation operating over time.
Contact our technical team
Phone
Opening hours
Monday to Thursday, 8:30 am to 12:45 pm and 2:00 pm to 6:00 pm; Friday, 8:30 am to 12:30 pm.